PONDEROSA SUBSTATION – MADRAS, OR
By
Crews built a new transmission line tap, re-configured the existing connection to the Substation and added a new bay on self-supporting steel structures. New 115kv breakers, switches, circuit switchers and CCVT’s were installed on new foundations inside the substation under the new bay.
